Ukweqa Kwezindleko Zokwakha eNingizimu Afrika: Ukuvimbela

Kubuyekezwe ngo-
Ukweqa Kwezindleko Zokwakha eNingizimu Afrika: Ukuvimbela

Ukweqa kwezindleko zokwakha kuyinto ejwayelekile eNingizimu Afrika, futhi ucwaningo lwezemfundo ngamaphrojekthi ombuso nawomkhakha ozimele eNingizimu Afrika luthola njalo amazinga okweqa asezingeni eliphakeme ngaphezu kwesabelomali sokuqala. Ucwaningo oluhlolwe ngontanga olwethulwa e-5th Built Environment Conference ye-Association of Schools of Construction of Southern Africa (Ramabodu & Verster, Department of Quantity Surveying and Construction Management, University of the Free State, 2010) lwaloba ukweqa kwezindleko okungu-58% e-Soccer City stadium eJohannesburg, okungu-50% e-Green Point Stadium eCape Town, kanye nokungu-38% e-Moses Mabhida Stadium eThekwini, amaphrojekthi amathathu okwakha aseNingizimu Afrika adume kakhulu. Kuphrojekthi engu-R5 million, ngisho ukweqa okungu-15–25% kungasho i-R750,000–R1.25 million ezindlekweni ezingalindelekile, okwanele ukusula ngokuphelele umkhawulo wenzuzo ojwayelekile.

Ukweqa kwezindleko akugcini nje ngokuncipha kwemikhawulo yenzuzo, kudala nengcindezi ye-cash flow, kulimaze ubudlelwane namaklayenti, futhi kungaholela ezingxabanweni ezibambezela izinkokhelo nokuqedwa komsebenzi. Emakethe yokwakha yaseNingizimu Afrika enokuncintisana okukhulu, lapho imikhawulo yenzuzo isivele imincane, ukuvimbela ukweqa kwezindleko kubalulekile ekusindeni kwebhizinisi.

Lo mhlahlandlela uchaza izimbangela eziyinhloko zokweqa kwezindleko zokwakha eNingizimu Afrika kanye namasu asebenzayo okuwavimbela: ukulinganisa, ukulawula ubukhulu bomsebenzi neziguquko, izindleko zezinto nezomthetho, kanye nokuthi kungani amathuluzi ajwayelekile ehluleka.

Ukuqonda Ukweqa Kwezindleko Zokwakha

Ukweqa kwezindleko kwenzeka lapho izindleko zangempela zephrojekthi zidlula isabelomali sokuqala. Kodwa akuwona wonke amaphutha alingana. Ukuqonda umehluko kukusiza uzivimbele futhi uziphathe ngempumelelo.

Izinhlobo Zokweqa Kwezindleko

Okuhleliwe kanye nokungahlelekile:

  • Ukweqa okuhleliwe, Izinguquko ezivunyelwe ngumakhi eziyandisa izindleko kodwa ezibhaliwe kahle futhi zikhokhelwe
  • Ukweqa okungahlelekile, Izindleko ezingalindelekile ezidla umkhawulo wenzuzo ngaphandle kwenkokhelo eyengeziwe

Okungabuyiswa kanye nokungenakubuyiswa:

  • Okungabuyiswa, Izindleko ongazibiza kumakhi ngezincomo zoshintsho (izinguquko zomakhi, amaphutha okuklama, izimo ezingalindelekile)
  • Okungenakubuyiswa, Izindleko okumele uzithwale (amaphutha akho okulinganisa, ukuphathwa kwesayithi okubi, ukumoshwa kwezinto)

Inhloso ukuncishisa okungenakubuyiswa nokuqinisekisa ukuthi zonke izindleko ezingabuyiswa ziyabizwa ngendlela efanele.

Umthelela Wangempela Wokweqa Kwezindleko

Ukweqa kwezindleko kuthinta ibhizinisi lakho ngezindlela eziningi:

Umthelela wezezimali:

  • Ukuncipha komkhawulo wenzuzo, irandi ngayinye engaphezu kwesabelomali incisha inzuzo yakho
  • Ingcindezi ye-cash flow, izindleko ezingalindelekile ziphungula imali yokusebenza
  • Ukuncipha kwenzuzo, ukweqa kwezindleko kungaguqula amaphrojekthi anenzuzo abe umonakalo

Umthelela wokusebenza:

  • Ukungqubuzana kwezinsiza, ukweqa kwephrojekthi eyodwa kuthinta ezinye
  • Ukwehla kwezinga, ingcindezi yokunciphisa izindleko ingehlisa izinga
  • Ukucindezeleka kwethimba, ingcindezi yezezimali idala ukucindezeleka kokusebenza

Umthelela odumeni:

  • Ubudlelwane namaklayenti buyehla lapho izabelomali zidlulwa
  • Umsebenzi wakusasa uba nzima ukuwuwina
  • Izingxabano ngezindleko zilimaza ubudlelwane besikhathi eside

Izimbangela Ezivamile Zokweqa Kwezindleko Zokwakha eNingizimu Afrika

Ukuqonda izimbangela kukusiza uzivimbele. Nazi izimbangela ezivamile emakethe yaseNingizimu Afrika:

Ukulinganisa Okubi Kokuqala

Ukulinganisa okubi kokuqala kuyimbangela eyinhloko yamaphutha amaningi ekweqeni kwezindleko. Uma ulinganisa izindleko ngaphansi kwezidingo esigabeni sokufaka isicelo, uqala ususesimweni esibuthakathaka, zonke izindleko ezingalindelekile zikushayela ngokwengeziwe emonakalweni.

Amaphutha avamile okulinganisa:

  • Ukubeka amanani aphansi ngokweqile, Ukufaka isicelo ngenani eliphansi ukuze uwine umsebenzi, bese kamuva utholakala ukuthi izindleko ziphakeme
  • Izinto ezishiyiwe, Ukukhohlwa ukufaka izindleko zokusetha isayithi, imisebenzi yesikhashana, noma ukuqedelwa
  • Izinombolo ezingalungile, Ukulinganisa ngaphansi izinga lezinto noma amahora omsebenzi
  • Amanani asendulo, Ukusebenzisa amanani amadala ezinto noma amanani omsebenzi angasabonisi izimo zamanje zemakethe
  • Isabelo esingasenele sezinto ezingalindelekile, Ukungabeki isabelo esanele sezinto ezingaziwa (ngokuvamile u-10–15% wamaphrojekthi okwakha)

Izinselele ezikhethekile zaseNingizimu Afrika zokulinganisa:

  • Ukunyakaza kohlelo lwemali, Izinto ezingeniswa kwamanye amazwe ezibekwa ngamanani e-USD/EUR ziyaguquka ngokuya kwezinga lokushintshaniswa kwemali
  • Izindleko zeload shedding, Uphethiloli wamajenareta, ukwehla komkhiqizo, izikhathi ezelulekiwe
  • Ukukhuphuka kwamanani ezinto, Ukukhuphuka okusheshayo kwamanani kasimende, insimbi, nezinye izinto
  • Izindleko zomthetho, Izinkokhelo ze-CIDB, ukubhaliswa kwe-NHBRC, izindleko zokuhambisana ne-B-BBEE

Isixazululo: Sebenzisa ama-Bills of Quantities (BOQ) anemininingwane agxile ekuhlolweni okunembile kwezinto. Buyekeza amanani ezinto njalo, okungenani ngenyanga ngezikhathi zokunyakaza. Faka isabelo esanele sezinto ezingalindelekile (u-10–15% wezinto ezingaziwa, kanye nezabelo ezikhethekile ze-load shedding nokukhuphuka kwamanani ezinto). Faka zonke izindleko ezikhethekile zaseNingizimu Afrika (ezomthetho, i-load shedding, ubungozi bohlelo lwemali). Sebenzisa idatha yamaphrojekthi angaphambilini ukuqinisekisa ukulinganisa.

Ukukhula Kobukhulu Bomsebenzi Neziguquko Zokuklama

Ukukhula kobukhulu bomsebenzi, lapho izidingo zephrojekthi zinweba ngale kwesilinganiso sokuqala, kuyimbangela enkulu yokweqa kwezindleko. Izicelo zomakhi zomsebenzi owengeziwe, izinguquko zokuklama, noma ukutholakala kwezidingo ezingalindelekile konke kwandisa izindleko.

Izimbangela ezivamile zokukhula kobukhulu bomsebenzi:

  • Izinguquko zomakhi, Izicelo zezici ezengeziwe, ukuqedelwa, noma ushintsho
  • Izinguquko zokuklama, Osonhlalakahle noma onjiniyela beshintsha imiklamo phakathi nokwakha
  • Imiklamo yokuqala engaphelele, Imininingwane eshiyiwe edinga umsebenzi owengeziwe
  • Ukutholakala kwezimo zesayithi, Ukuthola idwala, umhlabathi ongcolile, noma izinsiza ezingaboniswanga emidwebweni
  • Izinguquko zomthetho, Imithetho yokwakha emisha noma imithethonqubo edinga umsebenzi owengeziwe

Isixazululo: Yiba nezinqubo ezicacile zezincomo zoshintsho. Bhala zonke izinguquko zobukhulu bomsebenzi ngezincomo zoshintsho ezifanele. Thola imvume yomakhi nokubekwa kwamanani ngaphambi kokuqhubeka noshintsho. Sebenzisa isoftware yokuphatha amaphrojekthi ukulandelela izincomo zoshintsho nomthelela wazo kwizindleko. Faka isikhathi kanye nezindleko zesabelo ekulinganiseni izincomo zoshintsho ezilindelekile (ngokuvamile u-5–10% wenani lephrojekthi).

Ukukhuphuka Kwamanani Ezinto Ngamarandi

Ukukhuphuka kwamanani ezinto kuyinkinga ikakhulukazi eNingizimu Afrika, lapho amanani engakhuphuka ngo-10–20% ngonyaka owodwa. Uma ufaka isicelo ngoJanuwari uqale umsebenzi ngoJuni, amanani ezinto angase akhuphuke kakhulu.

Izici zokukhuphuka kwamanani ezinto:

  • Ukwehla kwehlelo lwemali, Ubuthakathaka berandi bukhuphula izindleko zezinto ezingenisiwe
  • Ukuphazamiseka koketango lokuhlinzeka, Ukubambezeleka kwamachweba, izinkinga zabahlinzeki, noma izinkinga zokukhiqiza
  • Ukunyakaza kwamanani empahla eyimikhiqizo, Amanani ensimbi, kasimende, nezinye izimpahla ziyaguquka
  • Ukukhuphuka kwamanani kaphethiloli, Izindleko zokuthutha zikhuphula amanani ezinto
  • Isidingo semakethe, Izikhathi zesidingo esiphezulu zikhuphula amanani

Isixazululo: Faka izinhlaka zokukhuphula amanani ezinto ezinkontrakeni lapho kungenzeka. Odoli izinto ezibalulekile kusenesikhathi ukuvala amanani. Faka ukukhuphuka kwamanani ezinto ekulinganiseni (ngokuvamile isabelo sonyaka esingu-5–10%). Landelela amanani ezinto njalo bese ulungisa ukulinganisa ngokufanele. Sebenzisa izivumelwano zokuhlinzeka ngenani elimisiwe lapho kungenzeka.

Amaphutha Okuklama Nezinto Ezishiyiwe

Amaphutha okuklama nezinto ezishiyiwe, lapho imiklamo ingaphelele, ingalungile, noma inamaphutha, kudala ukweqa kwezindleko lapho uthola izinkinga ngesikhathi sokwakha.

Izinkinga ezivamile zokuklama:

  • Imininingwane eshiyiwe, Imidwebo engaphelele edinga ukuchazwa noma umklamo owengeziwe
  • Amaphutha okuxhumanisa, Ukushayisana kwezinsiza, ukungqubuzana kwesakhiwo, noma amaphutha obukhulu
  • Amaphutha wemininingwane echaziwe, Imininingwane engalungile edinga izinguquko
  • Izinkinga zokuhambisana nemithethonqubo, Imiklamo engahambisani nemithethonqubo yokwakha noma imithetho

Isixazululo: Buyekeza imiklamo ngokucophelela ngaphambi kokuqala umsebenzi. Bona amaphutha nezinto ezishiyiwe kusenesikhathi bese uxoxa nethimba lokuklama. Bhala zonke izinguquko ezihlobene nokuklama ngezincomo zoshintsho ezifanele. Faka isabelo sezinto ezingalindelekile ekulinganiseni izinkinga zokuklama ezilindelekile (ngokuvamile u-3–5% wenani lephrojekthi).

Ukuphathwa Kwesayithi Okubi Nokumoshwa

Ukuphathwa kwesayithi okubi kuholela ekumosheni izinto, umsebenzi ophindiwe, nokungasebenzi kahle okwandisa izindleko ngaphandle kokwengeza inani.

Izinkinga ezivamile zokuphathwa kwesayithi:

  • Ukumoshwa kwezinto, Ukuoda kakhulu, ukugcinwa okubi, noma umonakalo ngesikhathi sokuphathwa
  • Umsebenzi ophindiwe, Umsebenzi okumele uphindwe ngenxa yamaphutha noma izinkinga zezinga
  • Umsebenzi ongasebenzi kahle, Umkhiqizo ombi, isikhathi esingasetshenziswa, noma izindlela zomsebenzi ezingalungile
  • Ukuxhumana okubi, Onkontraka abancane besebenza ngokuphambana noma bebangela ukubambezeleka
  • Ukuntuleka kokuqondisa, Ukuqondiswa okungasenele okuholela emaphutheni nasekumosheni

Isixazululo: Sebenzisa izinqubo ezifanele zokuphathwa kwesayithi. Landelela ukusetshenziswa kwezinto ngokumelene nesabelomali bese uthola ukumoshwa kusenesikhathi. Sebenzisa izincwadi zosuku zesayithi ukubhala umkhiqizo nokuthola ukungasebenzi kahle. Nikeza ukuqondiswa okwanele ukuvimbela amaphutha nomsebenzi ophindiwe. Xhumanisa onkontraka abancane ngempumelelo ukugwema ukungqubuzana nokubambezeleka.

Izinguquko Zomthetho Nezindleko Zokuhambisana

Izinguquko zomthetho, imithetho yokwakha emisha, imithethonqubo yemvelo, noma izidingo zokuhambisana, zingakhuphula izindleko ngokungalindelekile.

Ukukhuphuka okuvamile kwezindleko zomthetho:

  • Ukubuyekezwa kwemithetho yokwakha, Izidingo ezintsha zokusindwa kwamandla, ukufinyeleleka, noma ezokuphepha
  • Imithethonqubo yemvelo, Izidingo ezintsha zokuphathwa komfucuza, ukusetshenziswa kwamanzi, noma ukukhishwa kokungcolile
  • Ukuhambisana ne-B-BBEE, Izidingo zokuqukethwe kwendawo, ukuthuthukiswa kwamakhono, noma ubunikazi
  • Izidingo ze-CIDB, Izidingo ezintsha zesigaba noma amazinga okuhambisana
  • Imithetho kamasipala, Izinguquko emithethweni yendawo yokwakha noma izinqubo zemvume

Isixazululo: Hlala wazi ngezinguquko zomthetho. Faka izidingo zomthetho ezaziwayo ekulinganiseni. Faka isabelo sezinto ezingalindelekile ezinguqukweni zomthetho ezilindelekile (ngokuvamile u-2–5% wenani lephrojekthi). Xhumana nabaphathi bomthetho kusenesikhathi ukuze uqonde izidingo.

Izindleko Zesimo Sezulu Ne-Load Shedding

Ukubambezeleka ngenxa yesimo sezulu ne-load shedding kukhuphula izindleko ngokwelula izikhathi, ukwehla komkhiqizo, nezindleko ezengeziwe.

Ukukhuphuka kwezindleko ezihlobene nesimo sezulu:

  • Izindleko ezelulekile zesayithi ngesikhathi sokubambezeleka
  • Umonakalo wezinto ngenxa yesimo sezulu
  • Umsebenzi owengeziwe wokuvikela umsebenzi osaqhubeka
  • Ukwehla komkhiqizo ngesikhathi sesimo sezulu esibi kakhulu

Ukukhuphuka kwezindleko ze-load shedding:

  • Izindleko zophethiloli wamajenareta (u-R500–R2,000 ngosuku kuya ngosayizi wejenereta)
  • Ukwehla komkhiqizo (u-20–30% ngesikhathi sezigaba eziphakeme ze-load shedding)
  • Izikhathi ezelulekile ezikhuphula izindleko zesayithi
  • Ukwelulwa kokuqashwa kwezinto zokusebenza

Isixazululo: Faka izindleko zesimo sezulu ne-load shedding ekulinganiseni. Faka izindleko zophethiloli wamajenareta ezindlekweni zesayithi (ngokuvamile u-R10,000–R30,000 ngenyanga ngesikhathi se-load shedding ephakeme). Faka ukulahleka komkhiqizo ekulinganiseni komsebenzi. Hlela umsebenzi ukunciphisa umthelela wesimo sezulu ne-load shedding.

Umthelela Wangempela: Indlela Ukweqa Kwezindleko Okubhubhisa Ngayo Imikhawulo Yenzuzo

Ukuqonda umthelela wangempela kusiza ekubekeni okokuqala ukuvimbela. Nasi lokho ukweqa kwezindleko okubiza ngempela:

Isibonelo Sokuncipha Komkhawulo Wenzuzo

Cabanga ngephrojekthi engu-R5 million enomkhawulo we-15% (inzuzo engu-R750,000):

Isabelomali sokuqala:

  • Inani lenkontileka: R5,000,000
  • Izindleko ezilinganisiwe: R4,250,000
  • Inzuzo elindelekile: R750,000 (umkhawulo we-15%)

Ngokweqa kwezindleko okungu-20%:

  • Izindleko zangempela: R5,100,000 (R4,250,000 × 1.20)
  • Inani lenkontileka: R5,000,000 (alishintshanga)
  • Inzuzo yangempela: -R100,000 (umonakalo we-2%)

Ukweqa kwezindleko okungu-20% kuguqule inzuzo engu-R750,000 yaba umonakalo ongu-R100,000, okuwukunyakaza kwe-R850,000.

Umthelela We-Cash Flow

Ukweqa kwezindleko kudala ingcindezi ye-cash flow:

  • Uchitha okwengeziwe kunesabelomali, kodwa inani lenkontileka lihlala linjalo
  • Imali yokusebenza iboshwa ezindlekweni ezingalindelekile
  • Izitifiketi zenkokhelo azikhuphuki ukumboza ukweqa (ngaphandle uma izincomo zoshintsho zivunyiwe)
  • Ungase udinge ezinye izimali ukuqedela iphrojekthi

Ubungozi Bengxabano

Ukweqa kwezindleko kuvame ukuholela ezingxabanweni:

  • Amaklayenti aphikisana nezincomo zoshintsho ethi izindleko bekufanele zibe kusabelomali sokuqala
  • Izingxabano zibambezela izinkokhelo, kwenza i-cash flow ibe mbi
  • Izindleko zomthetho zengeza ezindlekweni zephrojekthi
  • Ubudlelwane buyehla, buthinta umsebenzi wakusasa

Amasu Okuvimbela: Indlela Yokugcina Amaphrojekthi Ngaphakathi Kwesabelomali

Ukuvimbela ukweqa kwezindleko kudinga izinqubo ezihlelekile. Nawa amasu asebenzayo:

1. I-BOQ Enembile Nokulinganisa Kokuqala

Sebenzisa ama-Bills of Quantities anemininingwane:

  • Ukuhlolwa okunembile kwezinto okususelwa emidwebweni
  • Amanani ezinto amanje (abuyekezwa njalo ngenyanga ngezikhathi zokunyakaza)
  • Amanani omsebenzi angokoqobo asuselwa emkhiqizweni wangempela
  • Izabelo ezanele zokumoshwa, ukuqondiswa, nezindleko zesayithi

Faka isabelo sezinto ezingalindelekile:

  • U-10–15% wezinto ezingaziwa nobungozi
  • Izabelo ezikhethekile ze-load shedding (R10,000–R30,000 ngenyanga)
  • Isabelo sokukhuphuka kwamanani ezinto (u-5–10% ngonyaka)
  • Isabelo sobungozi bokuklama (u-3–5% wezinkinga zokuklama ezilindelekile)

Qinisekisa ukulinganisa:

  • Qhathanisa nedatha yamaphrojekthi angaphambilini
  • Qhathanisa namanani emboni
  • Buyekeza nabalinganisi abanolwazi
  • Ungafaki isicelo ngaphansi kwezindleko ukuze uwine umsebenzi

2. Ukuhlela Isabelo Sezinto Ezingalindelekile

Beka eceleni isabelo sezinto ezingalindelekile:

  • Gcina u-10–15% wenani lephrojekthi njengesabelo sezinto ezingalindelekile
  • Ungasisebenzisi isabelo sezinto ezingalindelekile ezinguqukweni ezihleliwe, lezo kufanele zihlukane
  • Landelela ukusetshenziswa kwesabelo bese uligcwalisa uma kungenzeka
  • Bikela amaklayenti ngokusobala ngokusetshenziswa kwesabelo

Phatha isabelo sezinto ezingalindelekile ngokucophelela:

  • Sisebenzise kuphela ezintweni ezingaziwa ngempela, hhayi amaphutha okulinganisa
  • Thola imvume ngaphambi kokusebenzisa isabelo ezinguqukweni zomakhi
  • Landelela ukusetshenziswa kwesabelo ngokumelene nesabelomali
  • Ungaliphathi isabelo “njengemali yamahhala”

3. Ukuphathwa Kwezincomo Zoshintsho

Bhala zonke izinguquko:

  • Khipha izincomo zoshintsho kuzo zonke izinguquko zobukhulu bomsebenzi
  • Thola imvume yomakhi ngaphambi kokuqhubeka
  • Beka amanani ezincomo zoshintsho ngaphambi kokuqala umsebenzi
  • Landelela izindleko zezincomo zoshintsho ngokuhlukana nenkontileka eyisisekelo

Izindlela ezingcono zezincomo zoshintsho:

  • Thumela izincomo zoshintsho ngokushesha (phakathi kwezinsuku ezingu-7 kusukela esiyalezweni)
  • Faka ukwahlukaniswa kwezindleko okuningiliziwe
  • Bhekisa ezingxenyeni zenkontileka ezisekela isincomo soshintsho
  • Landelela izimvume ukugwema ukubambezeleka

4. Ukulandelela Izindleko Ngesikhathi Sangempela

Landelela izindleko ngesikhathi sangempela:

  • Qhathanisa izindleko zangempela nesabelomali njalo ngesonto
  • Bona ukwahluka kwezindleko kusenesikhathi
  • Phenya ukwahluka okukhulu ngokushesha
  • Thatha isinyathelo esilungisayo ngaphambi kokuba ukweqa kube okubucayi

Izigaba zokulandelela izindleko:

  • Izinto, ezangempela kuqhathaniswa nezilinganisiwe
  • Umsebenzi, amahora namanani kuqhathaniswa nesabelomali
  • Onkontraka abancane, ezangempela kuqhathaniswa nezilinganisiwe
  • Impahla nezinto zokusebenza, izindleko zokuqasha kuqhathaniswa nesabelomali
  • Izindleko zesayithi, ezangempela kuqhathaniswa nezilinganisiwe
  • Izincomo zoshintsho, zilandelelwe ngokuhlukana

5. Ukubuyekezwa Kwezindleko Njalo

Ukubuyekezwa kwezindleko njalo ngesonto:

  • Buyekeza izindleko zangempela kuqhathaniswa nesabelomali
  • Bona amathrendi nokwahluka
  • Bikezela izindleko zokugcina ngokususela emkhiqizweni wamanje
  • Thatha isinyathelo esilungisayo sokweqa

Imibiko yezindleko yenyanga:

  • Ukwahlukaniswa kwezindleko okuningiliziwe ngesigaba
  • Ukuhlaziywa kokwahluka okuchaza umehluko
  • Ukubikezelwa kwezindleko zokugcina
  • Izincomo zokulawula izindleko

6. Ukuphathwa Kwamanani Ezinto

Vala amanani kusenesikhathi:

  • Odoli izinto ezibalulekile kusenesikhathi ukuvala amanani
  • Sebenzisa izivumelwano zokuhlinzeka ngenani elimisiwe lapho kungenzeka
  • Landelela amanani ezinto bese ulungisa ukulinganisa ngokufanele
  • Faka izinhlaka zokukhuphula amanani ezinto ezinkontrakeni

Isu lokuthenga izinto:

  • Ukuoda ngobuningi kungancisha izindleko kodwa kuboshe imali
  • Ukuoda ngesikhathi esifanele kugcina imali kodwa kube nobungozi bokukhuphuka kwamanani
  • Linganisa ukonga izindleko nezidingo ze-cash flow
  • Yiba nabahlinzeki bokusekela ezinto ezibalulekile

7. Ukuphathwa Kwesayithi Nokunciphisa Ukumoshwa

Nciphisa ukumoshwa kwezinto:

  • Odoli izinto ngokunembile kususela ekuhlolweni okuningiliziwe
  • Gcina izinto kahle ukuvimbela umonakalo
  • Landelela ukusetshenziswa kwezinto ngokumelene nesabelomali
  • Phenya ukumoshwa okukhulu ngokushesha

Thuthukisa umkhiqizo:

  • Nikeza ukuqondiswa okwanele
  • Sebenzisa izindlela zomsebenzi namathuluzi afanele
  • Xhumanisa onkontraka abancane ngempumelelo
  • Landelela umkhiqizo womsebenzi bese ubhekana nezinkinga

Usaqhuba amaphrojekthi ngama-spreadsheet ne-WhatsApp? I-Wakha Software igcina izincwadi zosuku zesayithi, izabelomali, izitifiketi zenkokhelo, nobufakazi bokuhambisana kusoftware eyodwa eyakhelwe abakhi baseNingizimu Afrika — bona ukuboniswa komkhiqizo.

Indlela I-Wakha Software Esiza Ngayo Ukuvimbela Ukweqa Kwezindleko Zokwakha

I-Wakha Construction & Property Development Management Software inikeza amathuluzi akhelwe ngokukhethekile ukuvimbela ukweqa kwezindleko emaphrojekthini okwakha aseNingizimu Afrika.

Ukuphathwa Nokulandelela Kwesabelomali

I-Wakha ilandelela isabelomali sakho ngesikhathi sangempela:

  • Isabelomali kuqhathaniswa nangempela, Qhathanisa izindleko ezihleliwe nezindleko zangempela ngesigaba
  • Ukwahlukaniswa kwezindleko, Landelela izinto, umsebenzi, onkontraka abancane, impahla, nezindleko zesayithi ngokuhlukana
  • Ukuhlaziywa kokwahluka, Bona lapho izindleko zidlula khona isabelomali nokuthi kungani
  • Bikezela izindleko zokugcina, Bikezela izindleko zokugcina zephrojekthi ngokususela emkhiqizweni wamanje

Lokhu kubona ngesikhathi sangempela kukusiza ubone ukweqa kwezindleko kusenesikhathi, ngenkathi kusenokulawuleka.

Ukulandelela Izindleko Ngesikhathi Sangempela

I-Wakha ilandelela izindleko njengoba zenzeka:

  • Izindleko zezinto, Bhala ukuthengwa kwezinto uqhathanise nesabelomali
  • Izindleko zomsebenzi, Landelela amahora namanani omsebenzi kuqhathaniswa nesabelomali
  • Izindleko zonkontraka abancane, Bhala ama-invoyisi onkontraka abancane uqhathanise nesabelomali
  • Impahla nezinto zokusebenza, Landelela izindleko zokuqasha kuqhathaniswa nesabelomali
  • Izindleko zesayithi, Qapha izindleko zesayithi kuqhathaniswa nesabelomali

Lokhu kulandelela ngesikhathi sangempela kukusiza ubone ukwahluka kwezindleko ngokushesha bese uthatha isinyathelo esilungisayo.

Ukuphathwa Kwezincomo Zoshintsho

I-Wakha ikusiza ukuphatha izincomo zoshintsho ngendlela efanele:

  • Ukulandelela izincomo zoshintsho, Bhala zonke izinguquko zobukhulu bomsebenzi ngezincomo zoshintsho ezifanele
  • Ukubala izindleko, Bala izindleko zezincomo zoshintsho ngaphambi kokuqala umsebenzi
  • Umgudu wemvume, Landelela izimvume zezincomo zoshintsho bese ulandelela ukubambezeleka
  • Ukulandelela okuhlukene, Landelela izindleko zezincomo zoshintsho ngokuhlukana nenkontileka eyisisekelo

Ukuphathwa okufanele kwezincomo zoshintsho kuqinisekisa ukuthi zonke izindleko ezingabuyiswa ziyabizwa futhi zikhokhelwe.

Ukubikezelwa Kwe-Cash Flow

Ukubikezelwa kwe-cash flow kwe-Wakha kusiza ukuvimbela ukweqa kwezindleko:

  • Ukubikezelwa kwezindleko, Bikezela ukuthi izindleko zizokwenzeka nini ngokususela ohlelweni lwakho
  • Ukubikezelwa kwenkokhelo, Bikezela ukuthi uzothola nini izinkokhelo
  • Isimo semali, Bona isimo semali yakho isonto ngesonto
  • Izixwayiso zokuqala, Izixwayiso lapho i-cash flow isengozini

Ingcindezi ye-cash flow ingaphoqelela izinyathelo zokunciphisa izindleko ezehlisa izinga noma ezibangela ukubambezeleka. Ukuphathwa okufanele kwe-cash flow kuyakuvimbela lokhu.

Ukuhlanganiswa Kwe-BOQ

I-Wakha ikusiza ukuphatha ama-Bills of Quantities:

  • Ukungenisa i-BOQ, Ngenisa ama-BOQ avela ku-software yokulinganisa
  • Ukulandelela izinombolo, Landelela izinombolo ezisetshenzisiwe kuqhathaniswa nezinombolo ze-BOQ
  • Ukubuyekezwa kwamanani, Buyekeza amanani ezinto njalo
  • Ukuhlaziywa kokwahluka, Qhathanisa izinombolo namanani angempela kuqhathaniswa ne-BOQ

Lokhu kukusiza ubone lapho ukusetshenziswa kwezinto kudlula khona ukulinganisa bese uthatha isinyathelo esilungisayo.

Ukulandelela Izindleko Nezimpawu

Iphakheji ye-Finance ye-Wakha ilandelela izindleko uqhathanise nenqubekelaphambili kuphrojekthi ngayinye:

  • Ukulandelela, Qhathanisa izindleko nenani lomsebenzi osuwenziwe futhi ubone izindleko zokugcina ezilindelekile
  • Izimpawu, Izimpawu ze-On budget, At risk ne-Over budget kuphrojekthi ngayinye
  • Okuthengwe kusengaphambili, Landelela izinto ezithengwe kusengaphambili (MOS)
  • I-cash flow, Hlela i-cash flow ukugwema ukushoda kwemali okuhlobene nezindleko

Lezi zimpawu zikusiza wenze izinqumo ezinolwazi mayelana nokabiwa kwezinsiza nokubekwa kwezinto eziza kuqala emaphrojekthini.

Izici Zephakheji Ye-Finance

Iphakheji ye-Finance ye-Wakha ifaka:

  • Isabelomali (i-BOQ ngendlu ngayinye) namathempulethi
  • Izinguquko
  • Izindleko: ama-invoyisi, izimangalo zabancane osonkontileka, nemali encane
  • I-retention
  • Ukulandelela izindleko uqhathanise nenani lomsebenzi owenziwe, kanye nezindleko zokugcina ezilindelekile
  • I-cash flow
  • Izitifiketi zokukhokha (JBCC / NEC / GCC)
  • Izinto: ama-oda okuthenga, isitoko nemishini

Funda kabanzi ngezici zokuphathwa kwesabelomali ze-Wakha noma cela ukuboniswa ukubona ukuthi kungasiza kanjani ukuvimbela ukweqa kwezindleko emaphrojekthini akho.

Imibuzo Evame Ukubuzwa

Yiziphi izabelo ezifanele zezinto ezingalindelekile emaphrojekthini okwakha aseNingizimu Afrika?

Emaphrojekthini okwakha aseNingizimu Afrika, faka:

  • U-10–15% wesabelo sezinto ezingaziwa nobungozi jikelele
  • Okwengeziwe okungu-5–10% sokukhuphuka kwamanani ezinto (ikakhulukazi ngezikhathi zokunyakaza)
  • U-R10,000–R30,000 ngenyanga wezindleko ze-load shedding (uphethiloli wamajenareta, ukulahleka komkhiqizo)
  • U-3–5% wezinkinga zokuklama ezilindelekile nezincomo zoshintsho

Isabelo sonke sezinto ezingalindelekile sivamise ukuba phakathi kuka-15–25% kuya ngobunzima bephrojekthi nezimo zemakethe.

Ngingakwazi yini ukubuyisa izindleko emaphutheni okuklama?

Kuya ngenkontileka yakho. Iningi lezinkontileka ezijwayelekile (i-JBCC, i-NEC, i-GCC) livumela ukuthi ubize izindleko zamaphutha okuklama uma kungumthwalo womakhi noma umklami. Nokho, kumele:

  • Ubone amaphutha kusenesikhathi bese wazisa umakhi
  • Ubhale iphutha nomthelela walo ezindlekweni
  • Ukhiphe izincomo zoshintsho ezifanele
  • Uthole imvume yomakhi ngaphambi kokuqhubeka

Uma amaphutha okuklama engumthwalo wakho (isb., bekufanele uwabone ngesikhathi sesicelo), ungase ungakwazi ukubuyisa izindleko.

Ngiwaphatha kanjani amanani ezinto akhuphukayo ngemva kwesicelo?

Amanani ezinto akhuphukayo ngemva kwesicelo abungozi obukhulu. Izinketho zifaka:

  • Izinhlaka zokukhuphula amanani, Faka izinhlaka ezivumela ukulungiswa kwamanani ngenxa yokukhuphuka kwezinto
  • Ukuoda kusenesikhathi, Odoli izinto ezibalulekile kusenesikhathi ukuvala amanani
  • Izivumelwano zenani elimisiwe, Xoxisana ngezivumelwano zokuhlinzeka ngenani elimisiwe
  • Izincomo zoshintsho, Uma amanani ekhuphuka ngenxa yokubambezeleka noma izinguquko zomakhi, zibize ngezincomo zoshintsho

Uma amanani ezinto ekhuphuka ngenxa yezimo zemakethe futhi ungenazo izinhlaka zokukhuphula amanani, kungadingeka uthwale izindleko wena, yingakho ukufaka ukukhuphuka kwamanani ezinto ekulinganiseni kubalulekile.

Yini okumele ngiyenze uma iphrojekthi isidlule isabelomali?

Uma iphrojekthi isidlule isabelomali:

  1. Hlola isimo, Kungakanani okudlulisiwe? Yini eyibangele? Ingabuyiswa yini izindleko?
  2. Bona izindleko ezingabuyiswa, Iziphi izindleko ezingabizwa ngezincomo zoshintsho?
  3. Bhala konke, Gcina amarekhodi aningiliziwe ezimbangela nezindleko
  4. Khipha izincomo zoshintsho, Thumela izincomo zoshintsho kuzo zonke izindleko ezingabuyiswa
  5. Lawula ezinye izindleko, Thatha isinyathelo ukuvimbela ukweqa okwengeziwe
  6. Bikezela izindleko zokugcina, Bikezela izindleko zokugcina bese uhlela ngokufanele
  7. Xhumana nomakhi, Yiba sobala ngesimo nohlelo lokubuyisela

Ngingakuvimbela kanjani ukweqa kwezindleko okuvela ekukhuleni kobukhulu bomsebenzi?

Vimbela ukweqa kwezindleko okuvela ekukhuleni kobukhulu bomsebenzi nge:

  • Ukuba nezinqubo ezicacile zezincomo zoshintsho
  • Ukubhala zonke izinguquko zobukhulu bomsebenzi ngezincomo zoshintsho ezifanele
  • Ukuthola imvume yomakhi nokubekwa kwamanani ngaphambi kokuqhubeka
  • Ukusebenzisa isoftware yokuphatha amaphrojekthi ukulandelela izincomo zoshintsho
  • Ukufaka isabelo ekulinganiseni izinguquko ezilindelekile
  • Ukuthi “cha” ezinguqukweni ezingenazo izincomo zoshintsho ezifanele

Yini umehluko phakathi kwesabelo sezinto ezingalindelekile nenzuzo?

Isabelo sezinto ezingalindelekile nenzuzo kunobunjalo obuhlukene:

  • Isabelo sezinto ezingalindelekile, Isabelo sezinto ezingaziwa nobungozi (u-10–15% wenani lephrojekthi)
  • Inzuzo, Umkhawulo wakho wokwamukela iphrojekthi (ngokuvamile u-10–20% wenani lephrojekthi)

Ungasisebenzisi isabelo sezinto ezingalindelekile njengenzuzo, uma ungasidingi isabelo, siba yinzuzo eyengeziwe, kodwa ungakuhleleli lokho. Futhi ungasebenzisi inzuzo ukumboza ukweqa, lokho kuncisha umkhawulo wakho wenzuzo.

Isiphetho

Ukweqa kwezindleko zokwakha eNingizimu Afrika kuthinta iningi lamaphrojekthi futhi kuncisha imikhawulo yenzuzo. Ukuvimbela lokhu kudinga ukulinganisa okunembile, ukuhlela isabelo sezinto ezingalindelekile, ukuphathwa kwezincomo zoshintsho, nokulandelela izindleko okuhlobene nezinkontileka zakho nohlelo lomsebenzi. Sebenzisa amasu angenhla namathuluzi aqonda izinkontileka zendawo nokuhambisana.

Ukubona ukuthi i-Wakha isiza kanjani abakhi baseNingizimu Afrika ukuphatha izabelomali, i-BOQ, izincomo zoshintsho, ne-cash flow kusoftware eyodwa, iya ku-Wakha.