Back to Blog
NHBRC Inspection Stages
Wakha Team2 min read

NHBRC inspection stages are predictable, but failures still happen because drawings, evidence, and sign-offs are not managed as a system. This checklist gives a practical view of what to prepare for the common stage pattern: foundation, wall plate, and roof.
For deeper context, see NHBRC inspection stages.
Before any inspection (universal prep)
- Correct drawing revision on site
- Safe access and clear responsible person
- Site diary evidence captured with photos and dates
Foundation stage checklist
- Lines/levels and base prep documented
- Reinforcement and concrete records where applicable
- Services penetrations and damp-proofing aligned to drawings
Wall plate stage checklist
- Openings, lintels, anchorage and bracing documented
- Penetrations and moisture risks controlled
Roof stage checklist
- Truss/rafter installation evidence
- Bracing and hold-downs complete and documented
Book a demo
Book a demo to see how Wakha supports inspection readiness and evidence capture as part of daily site workflows.
FAQ
What’s the most common reason inspections fail?
Incomplete evidence and working off the wrong drawing revision.
Should I keep photos even for “good” work?
Yes. Photos and dated notes are often the easiest proof later if defects or disputes arise.
How do I keep evidence without slowing site?
Standardise a minimum daily capture routine in your site diary and link snags to photos and locations.
Related articles:
Written by
Wakha Team